Apiculture Factsheet #301
Packaged Bees - Handling, Hiving & Spring Management
Package bees are used to establish new colonies and replace
winter losses. Packages may come from British Columbia, Australia, New
Zealand and Chile. Honey bee queens may be imported from New Zealand, Australia,
Hawaii, approved sources of the continental USA, and Chile. Imported queens are often placed in bee packages produced in British Columbia.
A. The Package of Bees
A package of bees usually weighs 1 or 1.5 kg (2 or 3 lbs). The 2
lbs package contains approximately 8,000 bees; the 3 lbs package has
about 12,000 bees. The bees are shipped in a box with four wooden
sides and screened material in the front and back. It is 22 cm
(8.5”) high, 40 cm (16”) wide and 14 cm (5.5”) deep. An inverted can
filled with sugar syrup and placed inside the box provides feed for
the bees during transit. Some New Zealand packages are shipped in
tubular containers with a gelled feeding source.
The package contains a young queen that had started laying prior
to being caged and shipped. The queen is kept in a small wooden cage
with one screened side. The caged queen is well-protected during
transit and fed through the screen. This contact with the bees
improves her acceptance when the package is hived.
B. Ordering Packages
Packages should be ordered early. Orders can be placed with a B.C.
producer or local supplier. Some local beekeeper clubs place a large
single order to economize on price, permits and shipping.
When ordering from overseas sources, valid federal import permits
must accompany shipment. For detailed information, please visit
the Canadian Food Inspection Agency (CFIA) at http://www.inspection.gc.ca or call 403-292-5828.
Packages should arrive approximately 10 to 12 weeks prior to the
main nectar flow. In northern areas, the nectar flow does not start
until July, allowing for packages to arrive in mid to late April.
For southern areas where the nectar flow starts in mid to late
June, a late April delivery does not offer enough time for
population build up unless a three-pound package or nuc is used.
Beekeepers in southern areas are less dependent on packages since
wintering of bees is easier.
C. Getting Ready for Package Arrival
Equipment and supplies must be ready before packages arrive.
Bottom board, hive body, inner cover and hive cover should be ready
to use. Combs should be selected and placed in the brood chamber.
Preparation of the brood chamber. Nine or ten frames are
used in the brood chamber. When using ten, start with nine frames
when the package is installed, and add the tenth frame one week
later.
Use frames with honey and pollen stores when available. If the
frames are numbered 1 to 9, then frames 1, 2, 8, and 9 should
contain honey, while 3 and 7 should have pollen. The central frames
4, 5, and 6 should be about 75% free of honey and pollen to provide
room for brood development. Some dead brood from the previous year
(disease free!) in the centre frames is of no concern because the
bees will quickly clean it out.
Install an entrance reducer for the colony to conserve energy and
prevent robbing.
When many colonies are being established from packages, entrances
must be blocked off completely by stuffing in grass to prevent robbing.
The grass can be replaced with an entrance reducer only after the
bees have settled.
Apiary Site Selection. A sunny, wind-protected and well
drained location should be selected. Sunlight will warm the colony
and stimulate foraging.
Sugar Syrup. Prepare a sugar syrup solution of 1:1
sugar-water before the package is installed. Antibiotics may be
added for foulbrood disease control. Read the label for rate of
application. Add the antibiotic to COOL syrup only, just before
using.
Note: When introducing bees from outside sources, it is
recommended to apply antibiotics. For normal beekeeping
management practices, BC Ministry of Agriculture no longer recommends the preventative use
of antibiotics. Use drugs only when needed.
D. Handling Packages on Arrival
Care on Arrival. When transporting packages from the pick
up point to the apiary, prevent chilling or overheating. If packages
are transported in an open truck or trailer in colder weather, a
tarpaulin should be used. Check for overheating, especially during
frequent or longer stops. (Carry water hose or plastic bucket for
emergency. In case of longer stops in warm weather, hose packages
directly or sprinkle water from bucket).
After arrival, bees should be kept at room temperature (not
exceeding 21’C). Sprinkle the screen sides with warm sugar syrup or
use a handheld spray bottle not previously used for pesticide
applications. DO NOT use a brush to apply syrup onto the screens
as this may injure the feet and tongues of the bees. After the bees
have filled themselves with syrup, they will remain quiet until the
package is hived. Keep the packages at about 18’C and preferably in
a dark storage area. Package bees cannot be kept for much longer
than 7 days.
E. Installing Packages
Timing. Have the hive equipment in position before
bringing the package to the apiary. Take off the lid and inner
cover, and temporarily remove three or four adjacent frames from the
brood chamber. These frames may be from the centre, right or left
side of the brood chamber.
To install the bees, first take the package, grasp the feeding
can with one hand, and lift it up about one inch. Then, while
holding the feeding can, give the package a sharp shock by hitting
the ground. This will shake the bees onto the bottom of the cage,
allowing for quick removal of the can without clinging bees. While
the bees are still at the bottom, quickly remove the queen cage
being held by a metal strip in a slit next to the can opening.
Keep the queen cage separate. Take the package, insert upside
down into the hive and shake the bees through the hole. Continue to
shake until all the bees have been dislodged from the cage. Once in
the hive, bees may be lightly sprayed with sugar syrup or clean
water to reduce flying and drifting. This should not be done when
the weather is cold.
After the bees have been hived, gently re-install the frames.
Releasing the Queen. Before release, check on the
condition of the queen. If the queen is dead, contact your shipper
or dealer for replacement.
If the queen has been with the bees in the package for 3 days or
longer, use the direct release method. Lightly sprinkle some sugar
syrup through the screen to dampen the queen’s wings, as this will
prevent flight. Carefully remove one of the staples of the queen
cage without allowing the screen to open. Hold the queen cage down
in the hive where the bees are, partially remove the screen and
allow the queen to walk out onto the combs.
If the queen and the bees have not been together for 3 days, do
not release the queen. Place the cage vertically between 2 centre
frames so that the bees can feed the queen through the screen. After
1 or 2 days, remove the cork for the queen to come out.
F. Feeding
Feeding syrup helps the colony to settle down and establish
itself. If an inner cover is used, the feeding can or jar is
inverted and placed over the hole. Make sure the lid of the feeding
jar or can has very small holes to prevent leakage of sugar syrup.
(Note: The holes in the lid can be prepared using a nail. Make sure
the sharp edges point inward to prevent bee injury while feeding on
the syrup). After the inverted can or jar has been installed, place
an empty super on the inner cover and close the hive with the lid.
This will protect the syrup from cooling down rapidly as well as
prevent robbing. Alternatively, a frame feeder can be used inside
the hive.
G. Management of Package Bees
Bees are perishable and colonies continuously lose bees, which
are normally replaced by new bees during the beekeeping season. In a
package, there is no brood and consequently no replacement. After
installation, the population of bees will continue to decline for
several weeks. The queen will start laying 2 or 3 days after
installation, but it will take another 21 days before the first
replacement bees emerge. To assist in colony establishment and
maximize brood development, keep the hive entrance small, and ensure
ample pollen and sugar or honey reserves.
Providing ample feed is most important. Prepare a heavy syrup mix
of 2 parts sugar to 1 part of water and feed the bees whenever
weather prevents foraging and nectar secretion. This is particularly
important during the spring dearth period, after dandelion and fruit
bloom.
Second most important is the presence and performance of the
queen. Look for eggs and capped brood. If the brood is patchy or the
capped brood is raised, the queen may be poorly mated and need
prompt replacement.
When & What to Check:
On day 4 or 5 after package installation, check for brood to confirm
that the queen is laying. Select a comb in the centre of the cluster
by first removing outer frames. Carefully lift the frame and look
for eggs. Eggs are small, white and stand right up in the bottom of
the cell. If eggs are present, place the frame back into the hive.
It is not necessary to continue inspecting frames and search for the
queen.
After 10 – 14 days, check again for brood and brood pattern.
Solid capped brood pattern should be present. If the queen is absent
or the brood is unsatisfactory, a new queen should be introduced.
(Do NOT use the direct release method).
If brood appears spotty and irregular, closely examine for brood
diseases. When suspect cells are found, collect sample(s) and mail
to the BCMAL-Apiculture office for identification. Also refer to Factsheet #204 - Antibiotics for Bee Disease Control.
H. Use of Foundation
Straight beeswax foundation can be used instead of drawn combs.
It is recommended to provide the package colony with at least two
frames of drawn comb so the queen can start laying.
When foundation frames are used, it is imperative to offer the
bees plenty of syrup (2 parts sugar : 1 part water). One should plan
for about 20 liters (5 gallons) per hive. With ample syrup, about
25% of the comb will be drawn in 8 days, 45% in 12 days and 80% in
21 days. (Note that for every kilogram of wax, at least four
kilograms of syrup are needed).
Summary
For the successful development of a package colony, the following
should be provided:
- sunny, well drained, wind protected site
- entrance reducer
- plenty of sugar syrup and pollen
- regular checks for queen performance
For further information about spring management, refer to
Factsheet #401.
03/12